Understanding the RIBA Work Stages
A plain-English guide to the RIBA work stages, from brief and feasibility through design and technical drawings to construction and handover.
If you've never worked with an architect before, the RIBA stages can sound like jargon. In practice, they're simply a map of the journey from first idea to finished building, and they help everyone, client, architect and contractor, stay on the same page about what's happening and when.
Early stages are about establishing the brief and testing feasibility. Then come concept and spatial design, where the overall form and layout get worked out. Later stages turn that concept into the technical information a contractor can actually build from: structural details, specifications, coordination with other consultants. Finally there's the stage of construction itself, followed by handover.
Each stage has a purpose, and skipping ahead rarely saves time. Technical drawings produced before the design is settled usually need reworking, which costs more in the end than getting the sequence right from the start.
- Brief and feasibility: working out what's possible
- Concept and design development: shaping the building
- Technical design: the detail a contractor needs
- Construction and handover: seeing it built and completed
At ARK, we talk you through where your project sits in this sequence at every point, so there's always a clear sense of what comes next and why.